PROJECTS TO BE IMPLEMENTED IN FY 2026/27.

[featured_image]
  • Version
  • Download 0
  • File Size 19.91 KB
  • File Count 1
  • Create Date September 8, 2026
  • Last Updated September 8, 2026

PROJECTS TO BE IMPLEMENTED IN FY 2026/27.

KASESE DISTRICT LOCAL GOVERNMENT

PROJECTS TO BE IMPLEMENTED IN FY 2026/27

S/N PROJECTS AMOUNT
EDUCATION
1 Construction of a 3 classroom block at Buwatha  PS in Kilembe SC 178,192,506
2 Construction of a 2 classroom block at Kamatsuku PS in Ihandiro SC 127,637,950
3 Construction of a 2 classroom block at Kasambya SDA PS in Buhuhira SC 120,000,000
4 Construction of a 2 classroom block at Bikone PS in Ibanda Kyanya TC 110,000,000
5 Construction of a twin staff house at Muyina PS in Kisinga SC 190,000,000
6 Construction of a 2 classroom block at Mbata PS in Bwesumbu SC 120,000,000
7 Construction of a 2 classroom block at Kyarumba  PS in Kyarumba  TC 100,000,000
8 Construction of a 5 stance VIP latrine at Kyibirigha  PS in Ihandiro SC 50,000,000
9 Construction of a 4 stance VIP latrine with a girls' washroom at Kalonge Lower PS in Kyarumba  SC 50,000,000
10 Construction of a 5 stance VIP latrine at Rwesande SDA  PS in Kyabarungira SC 40,000,000
11 Construction of a 5 stance VIP latrine at Rugendabara  PS in Rugendabara- Kyikongo Town Council 40,000,000
12 Construction of a 5 stance VIP latrine at Nyamirami  PS in Muhokya SC 40,000,000
13 Construction of a 5 stance VIP latrine at Bunyandiko  PS in Ihandiro SC 40,000,000
14 Construction of a 5 stance VIP Latrine at Nyabirongo PS in Kisinga TC 40,000,000
15 Construction of a 5 stance VIP latrine at Ndongo SDA  PS in Nyakiyumbu SC 40,000,000
16 Rehabilitation of a 3 classroom block at Katebe PS in Maliba SC 90,000,000
17 Rehabilitation of a 4-classroom block at Buhaghura PS in Rukoki SC 120,000,000
18 Rehabilitation of a 3- classrooms block at Mubuku Moslem PS  in mubuku TC 90,000,000
19 Rehabilitation of a 4- classrooms block at Kibandama  PS  in Kilembe S/C phase II 70,000,000
20 Rehalitation of a 4- classrooms block at Mahango PS in Mahango S/C phase 2 50,000,000
21 Rehabilition of a 4- classrooms block at Nyakabingo PS in Nyakabingo S/C phase II 50,000,000
22 Reahabilitation of  a 4-classrooms block at Kaghema  PS in Kyarumba S/C 80,000,000
23 Rehabilitation of a 5-classrooms at  Kalingwe PS  in Kisinga S/C 140,000,000
24 Rehabilitation of a 3-classrooms block at Ntunga  PS in Buhuhira S/C 90,000,000
25 Rehabilitation of a 5- classrooms block at  Kyondo PS in Kyondo S/C 140,000,000
26 Rehabilitation of a 3- classrooms block at Bwera DEMO PS Mpondwe Lhubiriha TC 50,000,000
27 Rehabilitation of a 3 classroom block at Kanyatsi PS in  Kithoma-Kanyatsi TC 60,000,000
28 Rehabilitation of a 3 classroom block at Kiruli P/S in Maliba SC PHASE 2 20,000,000
29 Rehabilitation of a 2 classroom block at Kisebere in Kitholhu S/C PHASE 2 10,000,000
30 Co-funding for 2 classroom block at Mweya PS with support from Association Keiser Initiative for Uganda. 60,000,000
31 Furniture for Education Department Board room 19,580,000
32 Procurement of sitting facilities(desks) in the constructed classrooms at  Buwatha  52,Kamatsuku  36,Kasambya 36,Kyarumba  36 Kaghema 54,Kyondo 54,Kateba 54, Kanyatsi 54, Mubuku Moslem 54, Buhaghura 72  and Mbata Primary schools 146,187,510
HEALTH
33 Karambi HCII maternity -Phased 418,950,000
34 Renovation of DHO's office (Glasses, curtains, curtain rods, Tarazo) 120,000,000
35 Construct a 2 stance pit latrine at Kalingwe HCII 42,699,420
36 Completion of 6 stance latrine at Bwera General Hospsital 28,000,000
37 Completion of Fencing works at Hima, Bwesumbu and Buhuhira HC IIIs 160,000,000
PRODUCTION
38 Procurement of  5 Motorcycles for Extension Workers. 90,000,000
39 Establishment of a Slaughter Slub in Kasangali. 26,000,000
40 Completion of fish stall in Kayanja Landing Site. 16,778,259
41 Repair of the Fiberglass Boat and procurement of an engine. 33,000,000
42 Completion of the Muhokya Min-irrigation Scheme. 30,000,000
43 Establishment of Onion demonstrations in some selected mountain subcounties. 30,000,000
44 Support to diary demonstration sites in Busunga and Nyakakindo with water for animals. 40,000,000
ROADS AND ENGINEERING
45 Grading and Spot gravelling of Kamwani-Mbata -Kasangali Road 15Km 340,000,000
46 Opening and Grading of Muhokya- Kibiri Road 5.5km 220,000,000
47 Grading and spot gravelling of Mughete-Kabimba-Kitabu road 12km 268,000,000
48 Grading and Spot gravelling of Bwera-Karambi-Kathoma road 6.4km 172,000,000
49 Grading and Spot gravelling of  Kitswamba-Kithoma-Ntunga Road 9.6km 230,000,000
50 Grading and Spot gravelling of Mbunga-Nyakazinga-Karongo Road 21.5Km (PHASE 1) 545,402,819
51 Grading of Mudongo-Nyamighere-Kitagata Road -7Km (PHASE1) 70,000,000
52 Rehabilitation of Security and Tourism Community Access Roads 9km in Isango Subcounty 200,000,000
53 Construction of Administration Offices 600,000,000
54 Construction of a community council hall for Kabatunda-Kirabaho Town Council. 200,000,000
WATER
55 Design climate resilient piped water supply system Kihyo Gravity Flow scheme in Buhuhira subcounty to serve the parish of Kihyo. 130,000,000
56 Design climate resilient piped water supply system for Matere Gravity Flow scheme in Rukoki S/C 130,000,000
57 Appraisal & Feasibility studies of resilient piped water supply systems in :- 20,000,000
58 Construct Nyamustwa Gravity Flow scheme in Kyarumba subcounty. 310,000,000
59 Completion of Kendahi Solar powered water supply system Phase ii In Kistwamba subcounty. 40,000,000
60 Procurement of 1No. of Toyota Double cabin pickup 197,000,000
61 Increase rehabilitation and expansion of existing WASH infrastructure ;- Rehabilitate 30 Boreholes 77,000,000
LoCAL
62 Construction of 1 solar powered water system in Kitswamba Sub County for domestic use and for livestock including VIP latrine and 3 reserve tanks 577,000,000
63 Construction of 1 stone Arch Bridge to facilitate accessibility to basic social services in Karusandara Sub County 400,000,000
64 Establishment of an improved energy saving cook stove, construction of a Kitchen and installation of 3 water harvesting Tanks with the related infrastructure at Ihandiro Secondary. School in Ihandiro Sub County 100,000,000
65 Demarcation and restoration of 6km of Nyamugasani River Banks (3km on each side) to restore the riverbank ecological integrity and control the floods and provision of an alternative livelihood support 190,313,220
66 Construction of a 1-stance VIP latrine at the Nyakatonzi water switch house 15,000,000
67 Development of Technical Designs and BOQs for the Construction of 1 solar powered water systems in water stressed areas (water for domestic use and for livestock) in Kitswamba Sub County 40,000,000
68 Development of Technical Designs and BOQs for the Constructing a stone Arch Bridge in Karusandara Sub County 30,000,000
69 Development of Technical Designs and BOQs for the Construction of a VIP latrine, Establishment of an improved energy saving cook stove, construction of a Kitchen and installation of 3 water harvesting Tanks with the related infrastructure at Ihandiro Secondary School and Nyakatonzi respectively 10,000,000
TOURISM DEVELOPMENT
70 Re-design and documentation for  the upgrade of the Multipurpose Hall area  into a state of the art MICE center  with tourism information center,coffee shop, craft shop and washrooms 150,000,000
71 construction - phase One of the MICE center  at the current District multipurpose hall area 250,000,000
72 Design and install tourism signages for Ruboni Tourism village 14,000,000